Title: Excavation and consolidation of the Pardis tunnel
Location: Tehran - Phase 9 and Phase 11 of Pardis
Work volume: 500 meters of tunnel
Employer: Abadarahan Pars Company
Implementation method: Using the traditional method of drilling and blasting, which is done after drilling, drilling, and blasting, and then the surface is framed or stabilized with shotcrete.